Archived Information on
SANDY HOOK TO BARNEGAT INLET, NJ

Before replenishment
Before replenishment After replenishment
Before replenishment
After replenishment
Proctection is provided by constructing a 100-foot wide beach berm at an elevation of 10 feet above mean low water (MLW). The project also includes sand renourishment of the restored beaches on a 6-year cycle for a period of 50 years from the start of initial construction.

Beachfill placement in Bradley Beach
1999
Click for larger image
Dredge and pump out October 1999
Click on map to show high detail (743K JPEG)

Sand pumping and beachfill replacement July 1999
Click on map to show high detail (716K JPEG)
Click for larger image
Dredge and pump out July 1999
Click on map to show high detail (131K JPEG)
Click for larger image
Sand pumping and beachfill replacement July 1999
Click on map to show high detail (573K JPEG)

Replenished Monmouth Beach (background) and unnourished Sea Bight (foreground) 1995

Prior to project construction, waves crashed over the Monmouth Beach seawall and Ocean Avenue flooded
1987
 

For more information please read the Sandy Hook to Barnegat Inlet, NJ Fact Sheet or Project Manager, Daniel.T.Falt@usace.army.mil