Table 2. Available Reports on HARS Monitoring Activities.
|
Report
Title |
Author |
Date |
Data
Type(s) |
Monitoring
Dates |
Availability |
Mud Dump Sand Capping Summary
Report
|
PANYNJ
|
May
1998
|
Placement
Monitoring
|
20 August 1997 – 18 January 1998
|
Hard
Copy Available*
|
The 1997 Category II Capping Project
at the
|
SAIC
|
December
1998
|
REMOTS®
|
24 March – 2 April 1998
|
|
Automated Surveillance of
Disposal Operations During the 1998 Passenger Ship Terminal Project at the
Historic Area Remediation Site
|
SAIC
|
May
1998
|
Placement
Monitoring
|
23 March 1998 – 14 April 1998
|
|
The 1997 Category II Capping
Project at the
|
SAIC
|
August
1998
|
Bathymetry
|
7-8 April 1998
|
|
The 1997 Category II Capping
Project at the
|
SAIC
|
May
1998
|
Sediment
Cores
|
15-18 April 1998
|
|
The 1997 Category II Capping
Project at the Mud Dump Site: Summary of Geotechnical and Chemical Analysis
From the April 1998 Postcap Vibracoring Survey
|
SAIC
|
November
1998
|
Sediment
Core Geotechnical and Chemical Analyses
|
15-18 April 1998
|
|
The 1997 Category II Capping
Project at the
|
SAIC
|
October
1998
|
Seismic
|
26-27 April 1998
|
|
August 1998 REMOTS® Survey of
HARS Remediation Cells 1, 2, and 3
|
SAIC
|
November
1998
|
REMOTS®
|
5 – 10 August 1998
|
|
The 1997 Category II Capping
Project at the
|
SAIC
|
October
1999
|
Bathymetry
and REMOTS®
|
Bathymetry: 31 March – 1 April
1999, REMOTS®: 27 – 29
April 1999
|
|
The 1997 Category II Capping
Project at the
|
SAIC
|
February
2000
|
Sediment
Core Geotechnical and Chemical Analyses
|
11 – 12 May 1999
|
|
Results From the August 1999
Bathymetric Survey of HARS Remediation Areas 1 and 2
|
SAIC
|
January
2000
|
Bathymetry
|
17 – 26 August 1999
|
|
Results of the March 2000 REMOTS® and Side-Scan Sonar Survey of HARS Remediation Areas 1, 2, and 3
|
SAIC
|
August
2000
|
REMOTS®,
Side-Scan Sonar
|
Side Scan: 4-8 March, 2000
REMOTS® 29 January – 24 March, 2000
|
|
Assessment
of Sediment Transport Pathways Inshore of HARS from Near-bottom Current and
Turbidity Measurements Fall/Winter 2000 and Spring 2001
|
SAIC
|
July 2002
|
Physical Oceanographic
Data Collection
|
Fall
2000 through Spring 2001
|
|
Monitoring
Dredged Material Placement Operations in the
|
SAIC
|
Feb 2002
|
Placement monitoring
|
12
June 2000 – 28 Nov 2001
|
|
Summer
2002 Investigations of the Benthic Recolonization Status of Red Clay Deposits at the Hars
|
SAIC
|
February 2003
|
Bathymetry, Sub-bottom
profiling, Side-scan Sonar, Coring, REMOTS® , Benthic Grab Sampling
|
19
June – 9 September 2002
|
|
Results
of the Summer 2002 Monitoring Surveys of the 1993 Dioxin Capping Project
Mound at the Historic Area Remediation Site
|
SAIC
|
March 2003
|
Bathymetry, Sub-bottom profiling,
Side-scan Sonar, Coring, Chemistry, REMOTS®,
Benthic Grab Sampling
|
19
June – 9 September 2002
|
|
Results
of the Summer 2002 Monitoring Surveys of the 1997 Category II Capping Project
Mound at the Historic Area Remediation Site
|
SAIC
|
March 2003
|
Bathymetry, Sub-bottom
profiling, Side-scan Sonar, Coring, Chemistry, REMOTS® , Benthic Grab Sampling
|
19
June – 9 September 2002
|
|
Results
of the Summer 2002 Sediment Toxicity and Remots Sediment-Profile Imaging Survey at the Historic Area Remediation Site
|
SAIC
|
May 2003
|
REMOTS® , Grab Sampling, Sediment Toxicity
|
24
June – 13 July 2002
|
|
Results of the Summer 2002 Sediment Toxicity and Remots Sediment-Profile Imaging Survey at the Historic Area Remediation Site |
SAIC |
May 2003 |
Sediment Toxicity and REMOTS® |
July 2002 |
|
Results
Of The Summer 2002 Bathymetric and Side-Scan Sonar Survey at the Historic
Area Remediation Site
|
SAIC
|
February 2003
|
Bathymetry, Side-scan
Sonar
|
29
July – 12 September 2002
|
|
Monitoring
Dredged Material Placement Operations at the Historic Area Remediation Site
During the Kill Van Kull Contract #7 Project
|
SAIC
|
Oct 2002
|
Placement monitoring
|
14
August 2001 – 13 October 2002
|
|
Monitoring
Dredged Material Placement Operations at the Historic Area Remediation Site
During the Passenger Ship Terminal Project, March - June 2003
|
SAIC
|
Nov 2003
|
Placement monitoring
|
28
March – 3 June 2003
|
|
| Monitoring Dredged Material Placement Operations at the Historic Area Remediation Site During the Refined Sugar Project, October 2003 | SAIC
|
Nov 2003
|
Placement monitoring |
17- 29 October 2003 | |
Monitoring
Dredged Material Placement Operations at the Historic Area Remediation Site
and the
|
SAIC
|
Nov 2003
|
Placement monitoring
|
9
October 2002 – 18 December 2003
|
|
| CTD data | SAIC |
2003 |
Conductivity, Temperature, Depth Profile Data |
2002 and 2003 |
|
Monitoring
Dredged Material Placement Operations at the Historic Area Remediation Site
During the Passenger Ship Terminal Project, March – May 2004
|
SAIC
|
June 2004
|
Placement monitoring
|
31
March – 16 May 2004
|
|
| Results of the Summer 2005 Multibeam and Bathymetric and Backscatter Surveys at the Historic Area Remediation Site and the Shark River Reef | SAIC |
December 2005 |
Bathymetry and Backscatter Imagery |
August 2005 |
|
| Results of the Summer 2005 Sediment Toxicity and Sediment-Profile Imaging Survey at the Historic Area Remediation Site | SAIC |
December 2005 |
Sediment Toxicity and REMOTS® |
August – September 2005 |
|
| Results of the Summer 2005 Sediment Toxicity and Sediment-Profile Imaging Survey at the Historic Area Remediation Site (Appendices) | SAIC |
December 2005 |
Sediment Toxicity and REMOTS® |
August – September 2005 |
|
| Results of the Summer 2006 Multibeam Bathymetric and Backscatter Surveys at the Historic Area Remediation Site, Shark River Reef, Axel Carlson Reef, and Sandy Hook Reef | SAIC |
December 2006 |
Bathymetry and Backscatter Imagery |
August – September 2006 |
|
Results of the Summer 2006 Sediment - Profile Imaging and Sub-Bottom Profiling Survey at the Historic Area Remediation Site |
SAIC
|
2006 |
REMOTS® and sub-bottom profiling |
August-September 2006 |
|
Results of the 2007 Multibeam Bathymetric and Backscatter Surveys at the Historic Area Remediation Site |
SAIC
|
December
2007
|
Bathymetry and Backscatter Imagery |
20-24 September 2007 |
|
| Historic Area Remediation Site (H.A.R.S.) Summer 2008 | Rogers Surveying, P.L.L.C | 9/15/2008 | Bathymetric Survey | 6/18 – 7/30 2008 |
* A
copy of this report may be obtained upon written request to: