The applicant, Phillips 66 Holdings, has requested Department of the Army (DA) authorization to Demolish existing structures (dock, pier, moorings and pipes), dredge (deepening) by clam-shell bucket and blasting to a depth of 40 feet with 2 feet of overdredge, construction of new pier, dock, piping and dolphins at Berth A and Berth C-D within Waters of the United States to expand the facility to meet energy demands, in the Arthur Kill at 4601 Tremley Point Road, Linden, NJ 07036 (Latitude: 40.603035° Longitude -74.203852°)