Regulatory Public Notices

Results:
Archive: November, 2019
Clear
  • NAN-2019-00610-ERO

    Expiration date: 12/27/2019

    The applicant, Town of Southampton, has requested Department of the Army authorization to dredge Weesuck Creek, a tributary of Shinnecock Bay with upland placement of the dredged material at 22 Josiah Foster Path, Town of Southampton, Suffolk County, New York.

  • NAN-2016-00908-A-EHA

    Expiration date: 1/17/2020

    The permit applicant, Transcontinental Gas Pipe Line Company, LLC (Transco), has requested Department of the Army authorization for the ocean disposal of approximately 735,000 cubic yards of dredged material from the excavation / dredging of the trench for their proposed a new 26-inch-diameter natural gas transmission pipeline, including its subsea manifold tie-in and cathodic protection elements for the Northeast Supply Enhancement (NESE) project. The comment period expiration date is extended to January 17, 2020.

  • NAN-2019-00912-WPI

    Expiration date: 12/8/2019

    The applicants, Timothy and Linda McLaughlin, have requested Department of the Army authorization for the placement of fill in a freshwater wetland in order to construct a 3-lot residential subdivision.

  • NAN-2019-00589-WPI

    Expiration date: 12/4/2019

    The applicant, Sean Murphy, has requested Department of the Army authorization for the landward bulkhead replacement, dredging, and the placement of fill in a tidally influenced pond.

  • NAN-2019-01032-WNE

    Expiration date: 12/1/2019

    The applicant, Karry Choy, has requested Department of the Army authorization for dredging and the discharge of fill material in navigable waters of the United States for the replacement of 50 linear feet of shoreline stabilization and the installation of a new floating pier structure. This project is located in the Hudson River, Town of Garrison, Putnam County, New York.