  • NAN-2022-00959-EVI

    Expiration date: 3/18/2023

    The applicant, FTKS Holdings, LLC, has requested Department of the Army (DA) authorization to dredge with 10-year maintenance a boat basin along with the installation of a new bulkhead, jetties and new rock armorment in Gardiners Bay at 2835 Shipyard Lane, East Marion, Town of Southold, Suffolk County, New York.

  • NAN-2021-00214-EVI

    Expiration date: 3/18/2023

    The applicant, Atlantic Cove Marina, has requested Department of the Army (DA) authorization to conduct dredging, with ten-year maintenance with placement of all resultant dredged material at two (2) upland disposal sites located adjacent to the dredging area. The proposed dredging is located within a boat basin in Moriches Bay, East Moriches, Town of Brookhaven, Suffolk County, New York.

  • NAN-2021-01317-EMI

    Expiration date: 3/17/2023

    The permit applicant, New York City Economic Development Corporation, has requested Department of the Army (DA) authorization for maintenance activities along the Manhattan Greenway in the Harlem River in the Borough of Manhattan, New York County, City of New York, New York.

  • NAN-2020-01010-EVI

    Expiration date: 3/12/2023

    The applicant, 57 West Street LLC has requested Department of the Army (DA) authorization to install a new six-foot-wide by 85-foot-long aluminum ramp leading to a 30-foot-wide by 90-foot-long floating barge landing. The barge landing will be secured to the seafloor by four (4), 30-inch diameter steel spuds. The proposed structures will be located approximately 648 feet away from the East River Federal Channel.

  • NAN-2021-00852-EVI

    Expiration date: 3/9/2023

    The applicant, Town of Southampton Board of Trustees, has requested Department of the Army (DA) authorization to conduct dredging, with ten-year maintenance with placement of all resultant dredged material along a beach located to the north of the dredging location. All resultant dredged material would be placed along the beach shoreline above the plane of Spring High Water (SHW). The project is located within Carter Creek a tributary of Shinnecock Bay in Town Southampton, Suffolk County, New York.