  • NAN-2024-00378-ELO

    Expiration date: 8/7/2024

    The work would involve: Dredge, with ten-years maintenance, via clamshell bucket, approximately 18,722 cubic yards (CY) of material from an approximately 1.7-acre area to a depth range of between 34 and 38 feet below the plane of mean low water. The applicant plans to conduct one additional dredging event within the ten-year maintenance dredging period removing approximately 15,000 CY per event from within the same dredging area. The dredged material will be placed on a barge with scuppers and passively dewatered. Material will be offloaded over a spill-prevention apron and then transported to an upland disposal facility. The dredged material will be placed on a barge with scuppers and passively dewatered.

  • NAN-2024-00663-ENE

    Expiration date: 9/7/2024

    The permit applicant , Suffolk County Department of Public Works (SCDPW), has requested Department of the Army (DA) authorization to conduct dredging, with ten-years maintenance with placement of all resultant dredged material at designated beach placement areas. The project is located at East Creek in the Town if Riverhead, Suffolk County, New York.

  • NAN-2024-00498-EMI

    Expiration date: 8/26/2024

    The permit applicant, Breezy Point Cooperative, Inc., has requested Department of the Army (DA) authorization for groin modifications and beach nourishment in Rockaway Inlet/Jamaica Bay within Roxbury and Rockaway Point, Queens County, City of New York, New York.

  • NAN-2021-00603-TREC

    Expiration date: 8/30/2024

    The applicant, City of Peekskill, has requested Department of the Army authorization for the discharge of fill material over approximately 0.34 acres for beach nourishment and living shoreline construction in the Hudson River, City of Peekskill, Westchester County, New York.

  • NAN-2023-00888-TREC

    Expiration date: 8/26/2024

    The removal of material from 1,720 square foot and 3,750 square foot areas within the existing 20-foot wide navigation channel. The area will be dredged to the max depth of -4’MLW (with max side slopes) via barge mounted clamshell bulkhead crane. The material will be deposited landward of SHW and tidal wetlands. The material will be temporarily dewatered in an upland area and then transported to the site via small machinery.